Ongoing Projects
ON GOING PROJECTS
1. DEEP TUBE WELL INSTALLATION PROJECT, UNIT-2, THAKURGAON (2005-2010).
Estimated cost as per DPP Tk.15995.00 lakh (1st Revised).
Objective of the project :
a) To extend irrigation facilities through installation of 1100 nos. deep tube
wells for achieving self sufficiency of food by additional production of 28 upazillas of BMDA, Unit-2.
b) To bring 40500 ha. of land under controlled irrigation and to ensure supplementary irrigation.
c) To increase in cropping intensity from present condition to 225% creating irrigation facilities.
d) To improve the socio- economic condition of the people in project area by growing more food production.
e) To create more employment facilities for marginal farmers and day laborers.
f) To create employment facilities to the women.
g) Environmental development by increasing cropping intensity.
|
Components |
DPP Target |
Achievement up to June’10 |
For the year 2009-2010 (Tk. in Lakh) |
Cumulative Expenditure (% of DPP Allocation) (Tk. in Lakh) |
||
|
Rev. ADP Allocation |
Fund Released |
Expenditure |
||||
| 1) Construction Work:
i) DTW installation, (Nos.) ii) Under ground water distribution system (Nos.) & iii) Electrification of DTW (Nos.) |
1100
1100
1100 |
1100
1100
1100 |
1780.00 |
1780.00 |
1780.00 |
15994.61 (100%) |
| 2) Training (Person) |
5000 |
5000 |
||||
2. BARIND INTEGRATED AREA DEVELOPMENT PROJECT, Phase-III (Revised-1) (2007-2012).
Estimated cost as per DPP Tk. 28428.00 lakh.
Objective of the project :
a) To bring additional 50000 Hectare of land under controlled irrigation
management system by Deep tube well installation and its proper utilization through appropriate irrigation management.
b) To ensure supplementary irrigation in 60000 Hectare land of the project area.
c) To construct electrical networks for electrification of Deep Tube Well (DTW) .
d) To create employ facilities for marginal farmers and day labor.
e) To create employ facilities to the women.
|
Components |
DPP Target |
Achievement up to June’10 |
For the year 2009-2010 (Tk. in Lakh) |
Cumulative Expenditure (% of DPP Allocation) (Tk. in Lakh) |
||
|
Rev. ADP Allocation |
Fund Released |
Expenditure |
||||
| 1) Lifting of Ground Water by DTW (Nos.) |
2000 |
1255 |
8133.00 |
8133.00 |
8133.00 |
17768.00 (62.50%) |
| 2) Electrification of Deep TubeWell (Nos.) |
2000 |
1255 |
||||
| 2) Burried pipe irrigation channel (Nos.) |
2000 |
1255 |
||||
3. BARIND RAIN WATER CONSERVATION AND IRRIGATION PROJECT (2004-2010)
Estimated cost as per DPP Tk.15117.13 lakh (1st Revised).
Objective of the project :
a) To re-excavate khas khal, pond and water body for increasing the volume
of reservoir to hold rain water in the project area of Barind Multipurpose Development Authority identified as driest area of the country. And to use this water for various purpose.
b) To improve climate and environment of the project area by surface water augmentation and conservation.
c) To extend irrigation facilities through conservation of rain water near about 60000 hectare of land by re-excavation of 1000 kilometer derelict khas canal and 800 nos. of khas pond/water body and Construction of 555 nos. water control structures.
d) To increase psciculture and duck farming to mitigate protein deficiencies through conservation of rain water.
e) To increase ground water recharge through conservation of surface water harvested from rain.
f) To create employment facilities of the woman especially for tribal of the project area.
|
Components |
DPP Target |
Achievement up to June’10 |
For the year 2009-2010 (Tk. in Lakh) |
Cumulative Expenditure (% of DPP Allocation) (Tk. in Lakh) |
||
|
Rev. ADP Allocation |
Fund Released |
Expenditure |
||||
| 1) Re-excavation of khas khal/khari (km) |
1000 |
1000 |
2766.87 |
2766.87 |
2766.87 |
15116.81 (100%) |
| 2) Re-excavation of khas Pond (Nos.) |
800 |
800 |
||||
| 3) Construction of Submerged Wired (Nos.) |
555 |
555 |
||||
4. COMMAND AREA DEVELOPMENT AND TRAINING PROJECT, PHASE-2 (2008-2013)
Estimated cost as per DPP Tk. 16154.23 lakh.
Objective of the project :
a) To ensure the controlled and best use of lifted ground water in the project area
b) To bring about a self-sufficiency in food production through increasing command area with proper irrigation management.
c) To build-up a group of efficient and Technical manpower through providing training.
|
Components |
DPP Target |
Achievement up to June’10 |
For the year 2009-2010 (Tk. in Lakh) |
Cumulative Expenditure (% of DPP Allocation) (Tk. in Lakh) |
||
|
Rev. ADP Allocation |
Fund Released |
Expenditure |
||||
| 1. Construction of under ground Water Distribu-tion System (Nos.) |
2500 |
1115 |
4000.00 |
4000.00 |
4000.00 |
6999.78 (44.32%) |
| 2. Procurement of construction goods for water distribution system |
2500 |
1115 |
||||
| 3. Farmers training (Person) |
23500 |
11900 |
||||
5. ACTIVATING INOPRABLE DEEP TUBEWELL FOR IRRIGATION (2008-2013).
Estimated cost as per DPP Tk.19800.00 lakh.
Objective of the project :
a) To activate 2850 nos. inoperable/ unserviceable DTW through electrification and ensure utilization to irrigation.
b) To ensure efficient use of ground water through constructing 2850 nos of under ground water distribution channel (Buried Pipeline).
c) To ensure control irrigation of 0.86 lakh Hectare of land & a production of 7.40 lakh M.tones of food grains market value of which is about Tk. 81400.00 lakh per year
d) To develop of socio-economic condition of 1.92 lakh farmers family through alleviation of poverty and creating job opportunities.
|
Components |
DPP Target |
Achievement up to June’10 |
For the year 2009-2010 (Tk. in Lakh) |
Cumulative Expenditure (% of DPP Allocation) (Tk. in Lakh) |
||
|
Rev. ADP Allocation |
Fund Released |
Expenditure |
||||
| 1) Procurement of 2 cusec Submersible pump (set) |
1439 |
461 |
5500.00 |
5500.00 |
5500.00 |
7948.987 (39.49%) |
| 2) Construction of Underground water distribution channel (Nos.) |
2569 |
1042 |
||||
| 3) Installation & Commissioning Submersible pump and Lifting old pump (Nos.) |
1439 |
534 |
||||
| 4) Construction of electric line (Nos.) |
2113 |
1045 |
||||
6. Quality Seed Production Project on Farmer Level (2006-2011).
Estimated cost as per PP Tk. 1032.40 lakh.
Objective of the project :
a) Fill up the deficit of quality paddy seed in the project area.
b) Motivating farmers for producing improved seed of local of high yielding variety.
c) Train up farmer & staffs on production, procurement, processing & preservation of quality seed.
|
Components |
DPP Target |
Achievement up to June’10 |
For the year 2009-2010 (Tk. in Lakh) |
Cumulative Expenditure (% of DPP Allocation) (Tk. in Lakh) |
||
|
Rev. ADP Allocation |
Fund Released |
Expenditure |
||||
| 1. Manpower Developmenta) Farmer training (Person)b) Officers/Staffs training (Person) |
12500 100 |
10000 100 |
27.00 |
27.00 |
27.00 |
478.738 (94.73%) |
| 2. Demonstration plot establishment (Nos.) |
625 |
500 |
||||
| 3. Procurement of Foundation Seed / Breeder Seed (Mt.) |
65
|
55.01 |
||||
| 4. Seed Production, Procurement, Processing and Marketing (Mt.) |
2000 |
1936 |
||||
7. SMART CARD BASED PREPAID PUMP USAGE & ENERGY MEASURING SYSTEM (2008-2010).
Estimated cost as per PP Tk. 1567.31 lakh.
Objective of the project :
a) To supply irrigation water to the crop field with pre-payment system according to farmers actual demand.
b) To establish Pre-paid Pump Usages and Energy Measuring Unit in 3000 Deep Tube Wells.
c) To increase additional employment facilities to the laborers and marginal farmers during and after project implementation.
d) To prevent meter tempering and thus to check pilferage of electricity.
|
Components |
DPP Target |
Achievement up to June’10 |
For the year 2009-2010 (Tk. in Lakh) |
Cumulative Expenditure (% of DPP Allocation) (Tk. in Lakh) |
||
|
Rev. ADP Allocation |
Fund Released |
Expenditure |
||||
| 1) Smart Card |
30000 |
30000 |
1335.00 |
1335.00 |
1335.00 |
1435.00 (100.00%) |
| 2) Reappearing Tools |
8 |
8 |
||||
| 3) Large Capability Card |
200 |
200 |
||||
| 4) Radio 2 pair |
27 |
27 |
||||
| 5) Radio long hall |
27 |
27 |
||||
| 6) Router 2801Cisco |
9 |
9 |
||||
| 7) Cisco switch 2960T |
9 |
9 |
||||
| |
27 |
27 |
||||
| 9) Necessary equipment with Tower Installation/construction |
9 |
9 |
||||
| 10) Card reader |
25 |
25 |
||||
| 11) Mobile Vending Unit |
100 |
100 |
||||
| 12) Card printer with ribbon 4Pcs |
20 |
20 |
||||
| 13) Server with necessary equipment |
4 |
4 |
||||
| 14) Online UPS with necessary back-up 2000 VA |
9 |
9 |
||||
| 15) Pre-paid pump usages & energy measuring unit (3000 Nos) with installation |
3000 |
3000 |
||||
| 16) Mechanical circuit breaker |
3000 |
3000 |
||||
8. DEEP TUBE WELL INSTALLATION PROJECT, PHASE-ii, THAKURGAON (2010-2013).
Estimated cost as per DPP Tk.24785.00 lakh.
Objective of the project :
a) The principal objective is to extend irrigation facilities through installation of 1250 nos Deep Tube Wells in 65 Upazilas of Pabna, Sirajgonj, Bogra, Gaibandha, Rangpur, Kurigram Nilphamari and Lalmonirhat Districts.
b) To bring 37500 hectares of land under controlled irrigation management system.
c) To improve the socio-economic condition of the people in the project area by growing additional 1.875 lakh MT food grains.
d) To creat 60.00 lakh (0.375 lakh hectares ×160 mandays) man-days job opportunity for marginal farmers and day labourers.
|
Components |
DPP Target |
Achievement up to June’10 |
For the year 2009-2010 (Tk. in Lakh) |
Cumulative Expenditure (% of DPP Allocation) (Tk. in Lakh) |
||
|
Rev. ADP Allocation |
Fund Released |
Expenditure |
||||
| 1) Lifting of Ground Water by DTW (Nos.) |
1250 |
10 |
200.00 |
200.00 |
200.00 |
200.00 (0.81%) |
| 2) Electrification of Deep TubeWell (Nos.) |
1250 |
– |
||||
| 2) Burried pipe irrigation channel (Nos.) |
1250 |
– |
||||
9. Fine Rice production & marketing programe (2009-2012).
Estimated cost as per DPP Tk. 368.57 lakh.
Objective of the project :
a) To increase production of fine rice in Barind area & to help in earning foreign currency through exporting.
b) To produce & supply quality seed for fine rice grower through contract farming
c) To train up farmers & staffs on production, procurement, processing & preservation of fine rice seed.
d) To motivate farmers by establishing demonstration plot of fine rice.
e) To make linkage among the farmers, traders, dealers & exporters for increasing the process of fine rice exporting.
|
Components |
DPP Target |
Achievement up to June’10 |
For the year 2009-2010 (Tk. in Lakh) |
Cumulative Expenditure (% of DPP Allocation) (Tk. in Lakh) |
||
|
Rev. ADP Allocation |
Fund Released |
Expenditure |
||||
| 1. Manpower Development/Training |
9700 |
3700 |
82.17 |
82.17 |
82.1675 |
82.1675 (22.29%) |
| 2. Procurement of Foundation Seed / Breeder Seed (Mt.) |
3
|
1.20 |
||||
| 3. Seed Production, Procurement, Processing and Marketing (Mt.) |
300 |
178.32 |
||||
| 4. Demonstration plot establishment (Nos.) |
390
|
130 |
||||
10. DRINKING WATER SUPPLY FORM IRRIGATION DEEP TUBE WELL PROJECT (2008-2012)
Estimated cost as per RAPP Tk. 9940.00 lakh (Foreign Aided : 3220.00 Lakh).
Objective of the project :
a) To supply round the year potable water to every house of the rural people.
b) The supply system is more dependable.
c) It will help eradicate the disease, which is caused by shortage of potable water.
d) The general health condition of the village peoples will be improved.
|
Components |
DPP Target |
Achievement up to June’10 |
For the year 2009-2010 (Tk. in Lakh) |
Cumulative Expenditure (% of DPP Allocation) (Tk. in Lakh) |
||
|
Rev. ADP Allocation |
Fund Released |
Expenditure |
||||
| 1) Construction of water supply installation (Nos.) |
620 |
285 |
2402.09 (Foreign Aided: 1217.17) |
2217.17 (Foreign Aided: 1217.17) |
2205.44
|
3714.94 (37.49%) |
| 2) Extension of water supply installation (Nos.) |
24 |
5 |
||||
| 3) Training (Per.) |
1500 |
1050 |
||||
11. Barind Environmental Balance Restoration through Afforestation Project (2006-2010).
Estimated cost as per PP Tk. 2252.43 lakh.
Objective of the project :
a) To increase forest resources of the project area.
b) To enhance awareness of farmers on plantation of the project area.
c) To improve organic matter status of soil.
d) To create partial employment opportunity.
|
Components |
DPP Target |
Achievement up to June’10 |
For the year 2009-2010 (Tk. in Lakh) |
Cumulative Expenditure (% of DPP Allocation) (Tk. in Lakh) |
||
|
Rev. ADP Allocation |
Fund Released |
Expenditure |
||||
| 1. Manpower Developmenta) Farmer training (Person)b) Officers/Staff training (Person) |
1000 35 |
1003 39 |
490.00 |
490.00 |
490.00 |
2045.050 (90.79%) |
| 2. Plantation :a) Fruits Sapling (lake)b) Medicinal Forest Sapling(lake) |
16.67 18.66 |
15.50 18.20 |
||||
| 3. Nursery Development (Nos.) |
25
|
25 |
||||
12. CAPACITY BUILDING & RESORCE MOBILIZATION FOR SUSTAINABLE LAND MANAGEMENT (ECO SYSTEM MANAGEMENT) IN BANGLADESH (SLMP, BARIND PART) (2009-2011).
Estimated cost as per RAPP Tk. 57.998 lakh.
Objective of the project :
a) To increase land productivity
b) To introduce best practices and technologies on sustainable land management.
c) Identification and developing suitable crop verities through tissue culture.
d) Capacity building for local level coordination between institutions and advocacy on SLM.
e) To develop awareness among the rural about environmental activities.
f) To develop drinking water facilities.
|
Components |
DPP Target |
Achievement up to June’10 |
For the year 2009-2010 (Tk. in Lakh) |
Cumulative Expenditure (% of DPP Allocation) (Tk. in Lakh) |
||
|
Rev. ADP Allocation |
Fund Released |
Expenditure |
||||
| 1) Construction of tisuculture lab. (Nos.) |
1 |
1 |
45.475 |
45.475 |
45.475
|
45.475 (78.41%) |
| 2) Construction of water supply installation (Nos.) |
1 |
– |
||||
| 3) bio-gas plant (Nos). |
2 |
2 |
||||
| 4) Re-excavation of pond (Nos). |
2 |
1 |
||||
| 5) Water shield latrine ( nos). |
10 |
– |
||||
| 6) Training (person) |
79 |
75 |
||||
